The University of Texas at Tyler

The University of Texas at Tyler

Guest

The University of Texas at Tyler

Aerial Lift Pre-Use Inspection Permit Request

This form must be completed for all non-crane man or fork-lifts including, but not limited to, spider lifts, telescopic boom lifts, scissor lifts, articulating boom lifts, bucket trucks, telescopic fork lifts, etc.


IMPORTANT: Operator makes a service request if any item fails inspection.

Requester

* Required
* Required
* Required
* Required

Permit Date & Time

* Required
* Required
* Required
* Required

Location

* Required

    Aerial Lift Pre-Use Inspection

    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required

    Lift Inspection

    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required

    Work Area Inspection

    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required
    * Required

    Rescue shall be given to the MEWP occupant(s) if the machine is unable to be lowered for any reason, such as complete machine malfunction or work platform entanglement. *In the case of platform entanglement, the operator and occupants shall be removed from the platform prior to attempts being made to free the platform. *MEWPs which have tipped beyond their center of gravity shall be stabilized and secured before attempting rescue. *Rescue procedures near electrical conductors shall comply with local Minimum Safe Approach Distance (MSAD) Standards. Other MEWPs available for platform to platform evacuations as a last resort Rescue using another MEWP should be carried out only once a site review has been carried out. The plan should take into account the following: a. The rescue machine should be positioned to enable the rescue procedure to be carried out without compromising the safety of personnel involved in the rescue. b. The platforms of both machines shall be adjacent to each other with minimal horizontal/ vertical gap between them. The power to controls on both machines should be switched off during the c. The person being rescued should be fitted with proper fall protection equipment and maintain 100% tie off until the transfer is completed. d. The rescue machine shall not be overloaded during the rescue. This could mean making more than one trip to complete the rescue. e. Always comply with the manufacturer’s requirements stated in the operator’s manual.

    CALLING 911 IS NOT CONSIDERED A RESCUE PLAN!

    Add Supporting Documents

    Add files to upload as supporting documentation along with your permit request.